BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20200317T150000Z
DTEND:20200319T000000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:CANCELLED - Certified Erosion & Sediment Control Lead-CESCL
DESCRIPTION:The health and safety of our members is important to us. Due to COVID-19\, this event has been cancelled.\n\n\n\nDo you need a Construction Stormwater General Permit from Ecology? If your project disturbs over an acre of land or is in a subdivision\, you probably do. This permit states that all sites disturbing over an acre of land must have a Certified Erosion and Sediment Control Lead (CESCL). The CESCL is trained to inspect\, install\, and manage stormwater controls on your site. Ecology requires a CESCL to be on-call at all times\, so most companies will need more than one employee trained as a CESCL. This certification is good for three years.\n\n\n\nInstructor: DOE Certified Instructor\, Alex Zimmerman
X-ALT-DESC;FMTTYPE=text/html:<span style="color:#FF0000\;"><em><strong>The health and safety of our members is important to us. Due to COVID-19\, this event has been cancelled.</strong></em></span><br />\n<br />\nDo you need a Construction Stormwater General Permit from Ecology? If your project disturbs over an acre of land or is in a subdivision\, you probably do. This permit states that all sites disturbing over an acre of land must have a Certified Erosion and Sediment Control Lead (CESCL). The CESCL is trained to inspect\, install\, and manage stormwater controls on your site. Ecology requires a CESCL to be on-call at all times\, so most companies will need more than one employee trained as a CESCL. This certification is good for three years.<br />\n<br />\n<em>Instructor: DOE Certified Instructor\, Alex Zimmerman</em>
LOCATION:MBA Pierce 3711 Center Street Tacoma\, WA 98409
UID:e.9280.4014
SEQUENCE:3
DTSTAMP:20260417T032429Z
URL:https://members.masterbuilderspierce.com/events/details/cancelled-certified-erosion-sediment-control-lead-cescl-4014
END:VEVENT

END:VCALENDAR
